FINALLY!
The basement was supposed to be poured a couple of weeks ago but the plumber had a leak in one of the pipes which delayed things. Then we had some issues with the City last week because they lost our approved set of plans! So instead of calling and telling us that they just kept rejecting our inspection, with no reason marked on the slip. So finally the builder went to the City to figure out what was going on. Once they admitted they lost the plans we were able ot forge ahead, of course we had to provide them a copy of the approved set that we have. A little frustrating, but at least we are moving ahead now! Hopefully we will see some walls soon!
Tuesday, April 17, 2007
Basement is backfilled
Facing the back of the house looking to the left. We finally decided the layout of the basement will be the kitchen against the very farthest wall and the bathroom will be in the "nook" area.
Facing the back of the house looking to the right.
Another shot of facing the back of the house. Kind of gives you an idea of the backyard (or lack thereof).
Thursday, April 12, 2007
Yards are in!
Standing to the left of the house again (same location as above picture) but looking down at the "side lawn". I think this is going to be the general location of Trevor and I's vegetable garden. He has been requesting a veggie garden since we bought the lot, so I figure I better follow through on it.
Standing on Cherry Rd (upper rd) looking at the "front lawn"/front of the house. The fill here is a little deceptive because it almost looks like you can drive into the garage, well you could but you would need the excavator to lift your car out! =)
Here I am standing to the left of the house looking into the basement, which yes has some water in it. The drains are capped at the moment as to not fill them with backfill (no worries). Also you can see about 1/2 of the "back yard" in front of the excavator.
Thursday, March 29, 2007
Walls done!
Standing on the upper road (Cherry) looking down and to the right of the house. This closest corner is the bedroom that Trevor has claimed as his.
This is the giant support column for the front porch.
The garage. Obviously needs A LOT of fill!
The walls are done! Hopefully this week they will spray them with waterproofing stuff, put in the footing drains and downspouts. Then this weekend Ron will be backfilling. Then they will pour the basement floor and then hopefully they will start with the actually building.